Ask what exactly the client requires: an approved correction provider, a receiver certificate, a coordinate reference or a tested field method. These are different requirements. A generic statement that GEODNET is certified or uncertified everywhere cannot answer a project specification.
Read the acceptance requirement
Identify the authority, standard or contract clause that applies. Ask the client what records they require for control coordinates, instrument setup, observations and checks. If named provider approval is mandatory, request written evidence for that specific approval before fieldwork.
Document what you can verify
Record the service, date, receiver, reference frame and check results. Keep device conformity documents separate from survey accuracy evidence. A successful check on control is valuable, but it cannot waive an explicit requirement for a named approved service.
Match the specification in writing
Extract the client’s requirements for reference frame, control, accuracy checks and evidence to be delivered. Record how each will be satisfied and who can approve the method. A successful field check supports the accuracy assessment. It cannot substitute for an explicit client requirement to use a designated service or survey procedure.