A surveyor’s baseline is the distance from the rover to the reference station used for corrections. No single maximum distance guarantees survey-grade work. Satellite geometry, atmosphere, obstructions, data age and the required tolerance all affect what is feasible.
Evaluate the actual baseline
Check local coverage and the station selected by the service. In the field, record the baseline when the receiver displays it. Compare the rover result against independent control under representative conditions. A short distance to a station will not solve reflections beside a metal building.
Decide on a field limit
Use the project specification and the results of repeat checks. If checks fail, change the observation conditions or use a suitable alternative reference or survey method. Keep the evidence that supports the field decision instead of putting a generic kilometre figure in the report.
Log the observation conditions
At a known control mark, note which station supplied corrections where available, the time, solution state and correction age. Repeat the observation after reinitialising. If the job includes another site farther from the reference, repeat there in comparable open sky. Use the survey trial procedure to evaluate results against your own project tolerance.